Office Renovations
Construction has begun on an office in the basement. Plastic egg crate was put down on the concrete slab with 3/4 inch tongue and groove plywood over top.

Construction has begun on an office in the basement. Plastic egg crate was put down on the concrete slab with 3/4 inch tongue and groove plywood over top.
