Around the Grove

Blizzard of 2010

The Highway 402 corridor from Sarnia to London was hit with a severe winter storm that shut down the highway and stranded 300 people on the hiway.  High winds and blowing snow created whiteout conditions and massive snow drifts.  The storm that started on Decembers 12 is still causing disruptions in the area.

Sections of the 402 remain closed as snow removal efforts continue.  Lambton County declared an emergency on Tuesday morning and have asked the military to assist with rescue operations.  The military provided helicopters, planes and all terrain vehicles to reach areas that were snowed in.

Remembrance Day

I attended the Sarnia 2010 Remembrance Day ceremony at Veterans' Park.  The great weather brought out large crowd to watch the laying of the wreaths.  Close to a thousand people gathered around the Cenotaph at the 11th hour to honour Canada's war veterans.  Padre, Reverend Gord Simmons told those on hand we must never forget.   

Sarnia's Remembrance procession steps off from the Royal Canadian Legion this morning around 10:30, proceeding south on Front to George, then south on Christina Street to Wellington and the cenotaph at Veteran's Park in time for the 11th hour service.

Al sees the light

Jo mentioned that she wanted me to take down the plastic diffuser for the fluorescent light fixture in the hallway so that she could clean it..  Sounds easy right?

AV Cabinet

I decided that a built-in A/V cabinet would be a good idea for the basement family room.  The cabinet is 20" W x 40"H x 24"D.  The cabinet is made from 3/4" MDF with all joints glued, screwed and aligned with biscuits.  The upper and lower shelves can be adjusted up or down in 1" increments.

New roof

The roofing contractor finished the roof today.  I think the new colour works well.

Office Renovations - Cont. 5

Flooring installation started today.


May 18
Laminate flooring has been completed.


May 26
Baseboards are being installed.

Office Renovations - Cont. 4

Cutting, painting and installation of the ceiling tiles continues...


May 14
Painting and installation of ceiling tiles is complete.  The "runners" that run the length of the room and hide the gap between the tiles will be installed at the end of the project.

Office Renovations - Cont. 3

The drywall taping is now complete, the drywall primer/sealer has been applied and the first coat of colour has been applied.


May 3
The second and final coat of paint has been applied,  The ceiling grid has been installed in the closet and the ceiling tiles have been cut and temporarily installed.  The ceiling tiles will be removed for painting and to have the pot lights installed.  The installeation of the grid in the office has started.


May 4
The main field of the ceiling grid in the office has been installed.

Office Renovations - Cont. 2

The drywall taper was in today to start the job of seaming the drywall.  The first coat of compound was applied.  The taping is expected to be completed by the 29th.


April 24

Picked up yhe ceiling tiles for the suspended ceiling.   The decision to install a suspended ceiling was based on some pre-existing electrical junction boxes that would require rewireing other areas of the house to eliminate.  The suspended ceiling will allow access to the ceiling area in the future for any services that need to be worked on.
The ceiling tiles are made of MDF (Medium Density Fibreboard) are are meant to be painted or stained.  The ceiling grid is a system called CeilingMax, a new product is surface mounted to the joists (doesn't require a drop between the joists and the tiles).


 

Office Renovations - Continued

The partition walls for the office, hallway and walk-in closet have been completed.  Installation of the electrical and  central vac hookups are underway.


April 15th:  Drywall installation is complete in the office area.  The closet and hallway will be completed tomorrow.


April 16th:  Drywall instalation is complete, doors have been hung

.